360° visibility and real-time control over every production. Plan with smart templates, schedule resources, manage live events and forecast next quarter's demand — from one platform.
Trusted by broadcasters who can't afford to go dark
Four operational disciplines that used to live in four disconnected tools. ShowRunner replaces them with one continuous workflow — from first pitch to live air to post-show audit.
Build productions from reusable event templates. Group seasons, campaigns and one-offs under a 4-level taxonomy your CFO already recognises.
Drag-and-drop sub-events onto a real Gantt. Resolve TBD slots, run the approval workflow, and enforce shift rules per department.
Model satellite, IP, fibre and bonded-cellular paths. Diagram primary and backup routes per event. See open issues by severity before you go on air.
Live dashboard tracks every active event — delays, unfilled slots, equipment faults — with an AI assistant grounded in your real data, not a generic LLM.
Every production lives inside a closed cycle. ShowRunner is the connective tissue between every stage — and learns from each turn to make the next one cheaper, faster, and safer.
Every recurring production type ships as a customisable template — resources, timeline, scheduling and budget all pre-wired. Edit it once. Use it for every show.
Studio-floor + gallery + post — pre-mapped.
OB trucks, RF, location crew, weather windows.
Press conferences, launches, awards.
Match-day crewing, multi-camera + commentary.
Rolling-news desks, satellite truck dispatch.
Every screen earns its pixels. Dense, dark, instrument-grade — designed for shift handovers at 6am and live-TX rooms at 9pm.
Drag sub-events to reschedule. Re-assign staff in place. Spot conflicts as red bars before they become incident reports. The Gantt is the truth — every other view is a projection of it.
Satellite, IP streaming, RF, dark fibre, bonded cellular. Every link on every event is a configurable node. Backups are first-class — flag them, test them, fail over without losing your seat.
A 3D event room visualises the crew on the day. The embedded AI is grounded in your real events, staff and equipment — not a generic chatbot. Ask "what's at risk this week" and get a real answer with a real link to fix it.
Sound on, please. The whole platform — Plan, Schedule, Transmit, Control — in under a minute.
Sky — Europe's leading media and entertainment company, with 31,000 employees across 5 countries and 22 million customers — needed a single tool to plan and run on-location broadcasting across multiple business lines.
We needed a super resource-planning tool to improve content operations across Sky's multitude of channels. The two systems work flawlessly together and enable us more effective demand and supply planning, as well as increased operational productivity.
Business units include Sky News, Sky Sports, Sky Sports News and Sky Production Services. Read the full case study →
The six measurable shifts customers see in the first 90 days on ShowRunner.
One source of truth across planning, scheduling, transmission and control. Retire the spreadsheets, the standalone planner, and the shared inbox.
Walk us through your most operationally complex production. We'll show you how it would run on ShowRunner — live, on your data, in under 30 minutes.
30-minute walkthrough. No slideware. We'll bring your data, you bring the questions.